A tiled shower is the hardest working few square feet in any home, and it is also the place where poor work hides the longest. BGM Construction is based at 5 Swart Ln in Thorold, and shower tile installation is some of the most careful work our crew does in this city, from full shower rebuilds in Thorold South bungalows to brand new ensuites in Rolling Meadows.
Our position on every shower is simple: the waterproofing is the renovation, and the tile is the finish. The tile, grout and caulk you see are not what keeps water out of your walls. The membrane system underneath does that work, and it has to be built as one sealed unit before a single tile is set.
If you are planning a new tiled shower, or dealing with one that already leaks, call +1 365-524-1898 or send the details through our contact page for a free written quote. We measure the space, check the structure and the drains, and price the whole build before any work starts.

Shower Tile Installation Services in Thorold
BGM builds and rebuilds tiled showers across Thorold, and most projects fall into one of four types:
- New tiled showers in bathroom additions, basement bathrooms and full renovations
- Shower rebuilds after leaks, where failed tile and damaged board are stripped back to sound framing and the shower is built again properly
- Tub to shower conversions, replacing a tired tub alcove with a tiled walk in shower
- Curbed and curbless showers, including bench seats, niches and linear drains
A BGM shower build includes the framing and subfloor check, the base and its slope, the waterproofing membrane, tile and grout, sealing, and coordination with licensed plumbing when a drain or valve has to move. Shower glass is always measured after the tile is finished, never before, so the panels fit the real opening. Our shower tile installation services page describes the service across the Niagara Region, and our Thorold page covers the wider work we do in this city. When the whole room is being redone at the same time, the shower usually sits inside a larger bathroom renovation in Thorold. The same tile crew also handles tile installation in Thorold for floors and walls outside the shower, and kitchen backsplash work in Thorold when the kitchen is part of the same project.
Waterproofing First: How a BGM Shower Is Built to Not Leak
Most failed showers were never waterproofed at all. Tile and grout are not waterproof. Water passes through grout lines and hairline cracks, and whatever sits behind the tile decides whether that water dries out or rots the wall. Cement board on its own is not waterproofing: it is a stable tile backer, but water moves straight through it. A shower built on bare cement board over studs is a slow leak waiting for a start date.

A BGM shower is waterproofed as a system. Depending on the build, that is a sheet membrane of the Schluter KERDI type bonded over backer or foam board, or a liquid applied membrane built up to the required thickness. Every seam is sealed, inside and outside corners get their bands, and the pipe penetrations at the valve and shower arm are sealed with collars. At the bottom, the membrane ties directly into the drain flange, so any water that reaches the membrane has a path out instead of a path into the floor.
Under the membrane sits the base. We build either a traditional mortar bed or a prefabricated pre sloped tray, and both sit over a pre slope that falls about 1/4 inch per foot toward the drain, so water never ponds under the tile. Before any tile goes down, the finished base is flood tested: the drain is plugged, the base is filled, and the water level is checked again 24 hours later. If the level has dropped, the base is fixed and tested again. Tile only starts on a base that has held water for a full day. This is the approach set out in the TTMAC shower details, and it is the standard every Thorold shower we build is held to. Readers who want the floor build itself in detail can follow our guide on how to tile a shower floor.
Curbed or Curbless: Choosing the Right Build for Your Home
A curbed shower has a low tiled step at the entry that keeps water inside the wet zone. It is the simpler structure: it works on almost any floor, needs no recess in the framing, and suits smaller showers where splash control matters. A curbless, or barrier free, shower removes the step so the bathroom floor runs level into the shower. It looks clean, it is easier and safer to step into, and it is the right choice for anyone planning to age in place.

The drain decides much of the design. A centre drain needs slopes falling from all four sides, which suits mosaic and small format floor tile. A linear drain, set along a wall or across the entry, needs only one slope, which is what makes large format tile possible on a shower floor. Curbless builds ask more of the structure: the shower floor has to be recessed into the joists, or the bathroom floor built up to meet it, and the membrane has to run past the wet zone with the glass line and shower head position planned for splash. Our honest guide to curbless shower pros and cons walks through the decision in full. Some older Thorold floors cannot take a curbless recess without real structural work, and a few cannot take one at all. We check the joists before we promise anything, and if a curb is the sensible build for your house, we will tell you why.
Tile, Niches and Benches: The Finish Choices
With the waterproofing done, the finish choices are about looks, grip and upkeep. On the walls, large format porcelain is the most requested finish in Thorold right now: fewer grout lines, a calmer surface, and porcelain that does not need sealing. Ceramic wall tile is lighter and easier on the budget. Natural stone looks beautiful but goes into a shower only with sealing planned and the upkeep understood, because stone drinks water in a way porcelain never will.
On the floor, small mosaics earn their place: the many joints give grip underfoot, and small pieces follow the compound slopes around a centre drain without lippage. Grout matters more than most people expect. Cement grout is the standard, but epoxy grout is worth pricing in a hard used shower, because it absorbs almost no water and resists staining far longer. Niches are framed, waterproofed and sloped so the shelf sheds water instead of holding it, and benches are built into the membrane system rather than added on top of it, with corner shelves as the lighter option. Valves and fixtures are coordinated before tile starts, and the glass is templated only after the tile work is complete. Our step by step guide to how to tile shower walls shows how the wall build comes together.

Showers in Thorold Homes
A large share of our Thorold shower work is replacement, not new construction. Thorold South and the downtown streets hold postwar bungalows and semis whose original tiled tub surrounds and mortar bed shower floors are now more than 40 years old. The grout is cracked, the board behind it is soft, and the cast iron drains are at the end of their life. Before a new shower goes into one of these homes, we check the framing, the stiffness of the floor and the condition of the drain, because a new shower built on tired structure wastes the whole budget. Sometimes the honest answer is that the drain and part of the floor come out first.
The newer subdivisions ask for the opposite kind of work. In Rolling Meadows and Confederation Heights, ensuite showers are planned builds: curbless entries, linear drains, large format wall tile and built in benches are standard requests, and the framing underneath is predictable, so the design conversation leads instead of the repair conversation. There is also a rental side to Thorold. Homes near Brock University, along the Glenridge and Merritton edge and in the downtown core, need showers that survive tenant use with little fuss. For those, porcelain tile, an epoxy grout option and a proper membrane are the selling points, because the cheapest shower is the one that does not leak between tenancies.
Cost and Timeline for a Tiled Shower in Thorold
As a planning range, the tile work portion of a shower build commonly falls between 1,600 and 4,800 dollars per job in Ontario guides. A full tiled shower build costs more than that once the base, waterproofing, fixtures, plumbing changes and glass are added, and larger or curbless showers sit at the top of the range. The numbers that move a quote most are the size of the shower, the tile format, whether the drain or valve moves (a moved drain needs a permit through the City of Thorold and a licensed plumber), any structural work for a curbless recess, and the glass chosen. Most tiled shower builds take 4 to 7 working days, plus cure time before the first shower, and that sequence cannot be rushed: the flood test alone holds a full day. Our full shower tile installation cost guide breaks the numbers down in detail.
These figures are planning ranges only. The exact price for your shower comes from a written quote after we measure the room and check what is under the existing floor and behind the walls. If your shower is part of a whole room project, our bathroom renovation in Thorold page covers how the room is priced as one job. To start, call +1 365-524-1898 or reach us through the contact page and we will book a visit.
Frequently Asked Questions
How much does a tiled shower cost to build in Thorold?
The tile work alone commonly runs 1,600 to 4,800 dollars as a planning range, with the full build above that once the base, waterproofing, fixtures, plumbing and glass are counted. Size, tile format and drain work move the number most. Your exact price comes from a written quote after measuring, never from a range on a page.
How long does a shower tile installation take, start to first shower?
Most builds take 4 to 7 working days. On top of that sit the fixed waits: the 24 hour flood test before tile, thinset and grout curing after it, and silicone that needs its full cure before water runs. From the first day of work to the first shower, plan on roughly a week and a half for a standard build.
Can you turn my tub alcove into a tiled walk in shower?
Yes, this is one of the most common conversions we build in Thorold. A standard tub alcove already has the width a shower needs. The tub comes out, the drain and valve are set for the new layout, and the alcove is waterproofed and tiled as a walk in shower, curbed or curbless depending on the floor.
Is a curbless shower possible in my older Thorold home?
Sometimes, and it depends on the structure. The shower floor has to sit lower than the bathroom floor, so the joists need the depth and direction to allow a recess, and the drain has to work at the new height. Some postwar floors need structural work first, and a few rule it out. We inspect before we answer, and we will tell you plainly if a low curb is the better build.
What waterproofing do you use, and is cement board not enough?
We use full membrane systems: sheet membrane of the KERDI type or liquid applied membrane, with sealed seams, corners and pipe penetrations, tied into the drain. Cement board alone is not waterproofing. It is only a tile backer, and water passes through it, which is why so many older Thorold showers are wet inside the wall.
Why is my existing shower leaking or showing mould at the grout lines?
Cracked grout and mould are usually symptoms, not the disease. Water is getting behind the tile, most often because the shower was built with no membrane or a failed one, and it has nowhere to go. Regrouting the surface rarely fixes it for long. In many older showers the honest fix is a rebuild with real waterproofing, which is why we inspect before quoting.
Can I choose large format tile on the shower floor too?
Yes, with the right drain. Large format floor tile needs a single, simple slope, which a linear drain provides. A centre drain creates slopes in four directions, and small mosaics follow those compound slopes far better. If large format floors are the look you want, we plan the shower around a linear drain from the start.
Do you flood test the shower base before tiling?
Yes, on every build. The drain is plugged, the finished base is filled with water, the level is marked, and it is checked again 24 hours later. Tile only goes down on a base that has held its level for the full test. It is a simple check, and it is the one that proves the waterproofing before it is buried under tile.







