A tiled shower is not really a tile project. It is a waterproofing project with a tile finish, and the part you never see again after the walls close decides whether the shower lasts twenty years or starts leaking into the floor within five. That is the standard we build to in Niagara Falls, where the same week can take us into a postwar bungalow in Stamford with a shower at the end of its life, a Fallsview condo ensuite, and a licensed short term rental with daily back to back guest use. BGM Construction LTD is based in Thorold and builds tiled showers across the city. For the service without the city focus, see our shower tile installation services page, and for everything else we do here, our Niagara Falls page.

Finished walk in shower with large format beige porcelain wall tile, a built in tiled bench and a recessed storage niche
A finished walk in shower with large format porcelain walls, a built in bench to sit on and a tiled storage niche for bottles.

Shower Tile Work We Do in Niagara Falls

Full shower rebuilds and retiles

Most of our Niagara Falls shower work starts with an old shower that has run out of life. Sometimes the tile and base are sound and a retile is honest work. More often, especially in homes built before modern membrane standards, opening the walls shows a failed base or no real waterproofing at all, and the right answer is a full rebuild: strip to the studs, correct the plumbing, build a new sloped base, waterproof the enclosure and tile it as one system. We tell you which one your shower needs after we see inside it, and the quote reflects that finding.

Tub to shower conversions

Alcove tubs are still the standard in older Niagara Falls bathrooms, and many owners want that space as a proper walk in shower instead. A conversion means removing the tub, moving the drain and valve as needed, building the shower base where the tub sat, and waterproofing the walls as a shower enclosure. If it is part of a whole room project, it sits inside our Niagara Falls bathroom renovation work. This page keeps the shower build itself: base, waterproofing, tile and glass.

Walk in and curbless showers

Walk in showers with a low curb or no curb at all are the most requested builds in the city right now, from family bathrooms to rental suites. A curbless shower is very achievable, but it asks more of the floor structure and the waterproofing, because the whole bathroom floor becomes part of the wet area thinking. Our step by step walkthrough of a full build is in our guide to walk in shower tile installation, and the honest pricing picture is in our curbless shower cost guide.

Rental and short term rental showers built for turnover

Niagara Falls licenses its short term rentals, and guests judge a rental by its shower. A rental shower needs to shrug off daily use, hard water film and fast cleaning between stays, so we build them with full membrane waterproofing, durable porcelain, and grout choices that do not need babying, including epoxy grout where the use justifies it. Built this way, a shower stays out of the repair cycle, which is the whole point for a rental property. The same crew also handles the surrounding tile work, from floor and wall tile installation in Niagara Falls to kitchen backsplashes.

The Waterproofing System Behind the Tile

Tile and grout are not waterproof. Water passes through grout lines every time a shower runs; the system behind the tile catches it and sends it to the drain. Our standard build uses a sheet membrane system of the Schluter KERDI type bonded over suitable backer board, with every seam, corner and pipe penetration sealed. Niches and benches are waterproofed as part of the enclosure, not as an afterthought, because a niche shelf collects standing water exactly where a seam wants to fail; the detailing is in our guide to shower niche waterproofing. Liquid applied membranes suit certain shapes and repairs.

Before any tile goes on, the finished base gets a flood test: the drain is plugged, the pan is filled, and it is left to prove it holds water. It is a simple test many showers in this city never had, and it is the cheapest insurance in the project. If a shower leaks, it is almost never the tile that failed. It is the waterproofing or the base underneath, which is why this section, and not the tile catalogue, decides how long your shower lasts.

The Shower Base: Slope, Drains and Curbs

Every shower floor we build slopes to the drain at about 1 in 50, enough that water moves instead of pooling, without feeling sloped underfoot. The base is either a traditional mortar bed built on site or a pre sloped foam tray; both work when installed correctly, and the honest comparison is in our mortar bed vs prefab shower pan guide. Drains come in two forms: a center drain, which suits a four way slope and small mosaic floors, or a linear drain along one wall, which allows large format floor tile on a single gentle slope. We compare them in our linear drain vs center drain guide and recommend based on your tile and joists, not fashion.

Mosaic tile shower floor with a stainless steel linear drain set at the base of the back wall
Small mosaic floor tile follows the shower slope to a single linear drain and gives secure grip under wet feet.

A standard curb keeps the build simple and the water contained. A curbless entry removes the step but needs the floor recessed or the surrounding floor raised, so in older homes it depends on what the joists allow. Ontario has specific expectations for curb height, detailed in our shower curb height code guide for Ontario, and we build to them. If your structure allows curbless, we build it properly; if not, a low profile curb is the honest compromise.

Choosing Tile for a Niagara Falls Shower

On walls, large format porcelain is the current favourite in Niagara Falls ensuites: fewer grout lines, a clean read, and porcelain does not absorb water. Ceramic wall tile still has a fair place in budget conscious retiles. Our fuller selection guide is best tile for shower walls, worth a read before you fall for a catalogue photo. On floors, small format mosaic is not a style affectation. A shower floor has to bend over a slope in two directions, and small tiles follow that slope while giving your feet far more grip. Save the large tiles for the walls.

Natural stone looks beautiful and we install it, with one honest warning: stone needs sealing, and that sealing maintained, or hard water and soap will mark it. Niagara Falls treated water sits at about 119 mg per litre of hardness, moderately hard, which means a mineral film on glass, scale at fixtures, and grout that benefits from sealing. For family showers and rentals, porcelain that imitates stone gives the look without the upkeep. On grout: a quality cement grout, sealed, serves most homes well, and epoxy grout is the upgrade for heavy use and rentals. Glass is measured after tile, to fit the real opening, not the drawing.

What a Shower Tile Installation Costs in Niagara Falls

Every shower is measured and quoted in writing before work starts, and the exact price for yours comes from that quote, not from a table on a website. The ranges below are planning numbers drawn from current Ontario guides, where shower tile work commonly runs $1,500 to $4,500 per job and shower wall labour benchmarks sit around $18 to $35 per square foot.

Scope of workTypical planning range
Retile of a standard alcove shower, sound base kept$1,500 to $3,000
Full shower rebuild with new sloped base and full waterproofing$3,000 to $4,500
Tub to shower conversion, tile and base work$3,500 to $4,500 and up, depending on plumbing moves

Prices are before HST. Larger walk in and curbless builds, stone, benches, niches and glass all move a project above these ranges. For the full breakdown, read our shower tile installation cost guide, then book a measure for your written number.

How Long a Shower Build Takes

A standard shower rebuild runs about 3 to 5 working days of tile work once the waterproofing has cured, and most full projects land between one and two weeks on site. The sequence is demolition, plumbing corrections, base build and membrane work, then a genuine wait while waterproofing cures, because tiling over uncured membrane trades a day of patience for years of risk. Tile, grout and silicone follow, and glass is templated after tile, which can add a separate visit. Interior work runs year round, and winter is often the fastest time to get a Niagara contractor booked in.

Leaking Showers in Older Niagara Falls Homes

The postwar homes of Stamford and Westlane are reaching the age where their showers fail together, and the century homes around Drummondville often hide cast iron drains and old mortar beds behind tile that still looks respectable. The first symptom is usually grout that cracks, darkens or keeps coming back mouldy, and the common response is to regrout. Regrouting a leaking shower is money spent on the symptom: if water is getting through, the failure is in the base or the waterproofing behind the tile, and fresh grout seals the evidence in, not the water out. An honest surface repair exists for a chipped tile or a failed silicone joint, and we will do those gladly. But when the base has failed, a rebuild is the only real fix, and we would rather tell you that at the quote visit than sell you a repair that cannot work. Plumbing changes inside these jobs are licensed plumbing work, and where a City of Niagara Falls permit applies, we work to it.

Our Shower Installation Process, Step by Step

  • Visit and measure: we look at the existing shower and check the plumbing and structure the tile will depend on.
  • Written quote: scope, materials, waterproofing system and price fixed in writing before anything is booked.
  • Strip out: old tile, base and backer removed, and the framing, drain and subfloor inspected before new work covers them.
  • Plumbing check: valve, drain position and any conversion work completed, with cast iron replacements flagged early in older homes.
  • Base and waterproofing: sloped base built, membrane installed with sealed seams and corners, niche and bench waterproofed, flood test passed.
  • Tile work: walls and floor set to layout, using the method our shower wall tiling guide describes, then grouted and sealed.
  • Finish and walkthrough: silicone at changes of plane, fixtures trimmed, glass measured, and a final walkthrough with care instructions.
Tiler spreading thinset with a notched trowel on a shower wall, working around the shower control opening, with a finished subway tile shower wall beside him
Thinset is combed onto the shower wall in even ridges so every wall tile beds fully, with the valve opening kept clear.

Areas of Niagara Falls We Serve

We build and rebuild tiled showers across Niagara Falls, including Stamford, Westlane, Drummondville, Chippawa, the Fallsview area, the Lundy’s Lane corridor, Cummington Square, Battlefield, the Dorchester Road area and the newer south end subdivisions. Fallsview condo rebuilds are routine ensuite work, but building rules govern them: expect board approval, elevator booking and set work hours, and check your building before we schedule. BGM is based in Thorold, and our coverage runs across the whole Niagara Region: Thorold, Niagara Falls, St. Catharines, Welland, Fort Erie, Grimsby, Lincoln, Niagara-on-the-Lake, Pelham, Port Colborne, Wainfleet and West Lincoln.

Get a Written Quote for Your Shower

If your shower is leaking, dated, or still a tub you step over every morning, the next step is a measure and a fixed written quote. Call BGM Construction LTD at +1 365-524-1898 or send the details through our contact page. Tell us the shower type, its size and what you want changed.

Frequently Asked Questions

How much does it cost to retile a shower in Niagara Falls?

As a planning range, a retile of a standard alcove shower with a sound base kept commonly runs $1,500 to $3,000, and a full rebuild with a new sloped base and full waterproofing runs $3,000 to $4,500, before HST. Larger walk in or curbless builds, stone and glass move above that. Your exact price comes from a written quote after we measure and see what is behind your existing tile.

How long does a shower tile installation take?

Plan on one to two weeks from strip out to finish for a full rebuild. The tile work itself is about 3 to 5 working days once waterproofing has cured, and the curing wait is part of the job, not a delay. Glass is measured after tile and may add a separate visit.

What waterproofing do you use, and is it included?

Waterproofing is always included; it is the job. Our standard is a sheet membrane system of the Schluter KERDI type over suitable backer board, with sealed seams, corners and penetrations, waterproofed niches and benches, and a flood test before tile. Tile and grout alone are not waterproof, and any quote that treats the membrane as an optional extra is a quote to question.

My shower is leaking. Can it be repaired or does it need a rebuild?

It depends on what has failed. A chipped tile, a cracked grout line at a corner or perished silicone can be repaired honestly. But if water is reaching the base or the wall structure, the failure is in the waterproofing underneath, and no surface repair, including regrouting, can fix it. In older homes with original bases, a rebuild is usually the truthful answer, and we will show you the evidence before you commit.

Can you convert my tub into a walk in shower?

Yes, conversions are some of our most common Niagara Falls projects. The tub comes out, the drain and valve are checked and repositioned as needed, and a sloped, fully waterproofed base is built in the alcove. Tile and base work typically plans at $3,500 to $4,500 and up depending on plumbing moves, and if the conversion is part of a full bathroom renovation we scope it with the room.

Is a curbless shower possible in my older Niagara Falls home?

Often, yes, but it depends on your floor structure. A curbless entry needs the shower floor recessed or the bathroom floor built up so the slope to the drain still works, and some older joist layouts allow that easily while others do not. We confirm it at the measure visit. Where curbless is not practical, a low profile curb gives nearly the same access with a conventional base.

How soon can I use the shower after the tile is finished?

Allow at least 48 to 72 hours after grouting and silicone before the first shower, so grout cures and silicone fully sets. If grout or stone is being sealed, add the sealer’s cure time on top. We give you the exact date at the walkthrough, because rushing the first use is how fresh grout gets damaged.

What tile is best for a shower floor?

Small format tile, usually mosaic on mesh sheets. A shower floor slopes to the drain in more than one direction, and small tiles follow that slope without lippage while giving far more grip under wet feet. Porcelain mosaic is the durable, low upkeep choice for local water; stone mosaic needs sealing and more care.

BGM CONSTRUCTION LTD place picture
5.0
Based on 9 reviews
Anuragh mahajan profile picture
Anuragh mahajan
3 months ago
⭐️⭐️⭐️⭐️⭐️ Absolutely impressed with our bathroom renovation. The tile work is beautiful, precise, and professionally finished. The team was reliable, respectful, kept everything clean, and paid attention to every detail. The final result feels like a luxury bathroom and exceeded our expectations. If you’re considering a bathroom or tile renovation, I highly recommend calling them—you’ll be in good hands.
yousuf kharal profile picture
yousuf kharal
3 months ago
Very happy with the service at BGM👍 Quote for my basement was really reasonable and cheaper than most , no hidden fees, and most importantly the quality of finishing was fantastic!
PREMIUM AUTO PARTS profile picture
PREMIUM AUTO PARTS
3 months ago
Reasonable price and professional work. I recommend this construction company.
Tab 3 profile picture
Tab 3
3 months ago
Taqi Waraich profile picture
Taqi Waraich
3 months ago
“Excellent service from BGM Construction Ltd.! Very professional, friendly, and reliable team. Great quality work and excellent communication. Highly recommended!”
Okeno Bailey profile picture
Okeno Bailey
4 months ago
It's such a great feeling to find professional responsible company like BGM construction they did my drive way and Im so satisfied with the service the offer..
Asif Javed profile picture
Asif Javed
4 months ago
BGM was easy to talk to as we planned our renovation, working through options with us. He was always responsive during the course of the project and discussed any potential scope changes with us before proceeding. His staff were all highly skilled and diligent. We were very happy with our kitchen and bathroom renovations.

Get a Free Quote

WhatsApp